Country
Kazakhstan: LNG infrastructure
Kazakhstan has 49 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
no import terminal tracked
Pipelines
49
43,165 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
Gas pipelines crossing Kazakhstan
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Akshabulak-Kyzylorda Gas PipelineAkshabulak → Kyzylorda | Kazakhstan | Operating | 123 km | 0.42 bcm/y | 1 | 2004 |
| Aktobe-Kostanay Gas PipelineKS-14 → Kostanay | Kazakhstan | Under construction | 630 km | 5 bcm/y | 1 | 2028 |
| Almaty-Bayserke-Talgar Gas PipelineAlmaty → Talgar | Kazakhstan | Operating | 64 km | 2.4 bcm/y | 1 | 2014 |
| Almaty-Bayserke-Talgar Gas PipelineAlmaty → Talgar | Kazakhstan | Operating | 62 km | 0 bcm/y | 1 | 2024 |
| Almaty-Taldykorgan Gas PipelineUzynagash → Taldykorgan | Kazakhstan | Operating | 265 km | Not reported | 1 | 2017 |
| Amangeldy-KS5 Gas PipelineAmangeldy → Taraz | Kazakhstan | Operating | 193 km | 0.7 bcm/y | 1 | 2003 |
| Beineu-Bozoy-Shymkent Gas PipelineBeyneu (Beineu) → Shymkent | Kazakhstan | Operating | 1,449 km | 15 bcm/y | 1 | 2013 |
| Beineu-Bozoy-Shymkent Gas PipelineBeyneu (Beineu) → Shymkent | Kazakhstan | Under construction | 1,449 km | 10 bcm/y | 1 | 2026 |
| Bukhara-Tashkent-Bishkek-Almaty Gas PipelineBukhara → Almaty | Uzbekistan, Kyrgyzstan, Kazakhstan | Operating | 1,585 km | 12 bcm/y | 1 | 1971 |
| Bukhara-Tashkent-Bishkek-Almaty Gas PipelineBukhara → Almaty | Uzbekistan, Kyrgyzstan, Kazakhstan | Operating | 1,585 km | 3.9 bcm/y | 1 | 1999 |
| Bukhara-Ural Gas PipelineGazli → Chelyabinsk | Uzbekistan, Turkmenistan, Kazakhstan, Russia | Operating | 2,200 km | 21 bcm/y | 1 | 1963 |
| Bukhara-Ural Gas PipelineGazli → Yekaterinburg | Uzbekistan, Turkmenistan, Kazakhstan, Russia | Operating | 2,382 km | 21 bcm/y | 1 | 1966 |
| Bukhara-Ural Gas PipelineKS-14 → Aktobe | Kazakhstan | Operating | 165 km | 2.4 bcm/y | 1 | 2025 |
| Bukhara-Ural Gas PipelineKS 14 → Aktobe | Kazakhstan | Operating | 158 km | 0 bcm/y | 1 | 1968 |
| Bukhara-Ural Gas PipelineKS 14 → Aktobe | Kazakhstan | Operating | 158 km | 0 bcm/y | 1 | — |
| Caspian Coastal Gas PipelineBelek Compressor Station → Alexandrov Gay | Turkmenistan, Uzbekistan, Kazakhstan, Russia | Cancelled | 1,996 km | 25 bcm/y | 1 | — |
| Central Asia–Center Gas PipelineMary → Voskresensk | Turkmenistan, Uzbekistan, Kazakhstan, Russia | Operating | 2,662 km | 60.2 bcm/y | 1 | 1970 |
| Central Asia–Center Gas PipelineBeyneu → Gubkin | Turkmenistan, Uzbekistan, Kazakhstan, Russia | Operating | 2,600 km | 5 bcm/y | 1 | 1975 |
| Central Asia–Center Gas Pipeline | Turkmenistan, Uzbekistan, Kazakhstan, Russia | Operating | 3,700 km | 60.2 bcm/y | 1 | 1976 |
| Central Asia–Center Gas Pipeline | Turkmenistan, Uzbekistan, Kazakhstan, Russia | Operating | 2,895 km | 60.2 bcm/y | 1 | 1985 |
| Central Asia–China Gas PipelineGetaim → Horgos | Turkmenistan, Uzbekistan, Kazakhstan, China | Operating | 1,833 km | 25 bcm/y | 1 | 2014 |
| Central Asia–China Gas PipelineGetaim → Horgos | Turkmenistan, Uzbekistan, Kazakhstan, China | Operating | 1,833 km | 15 bcm/y | 1 | 2009 |
| Central Asia–China Gas PipelineGetaim → Horgos | Turkmenistan, Uzbekistan, Kazakhstan, China | Operating | 1,833 km | 15 bcm/y | 1 | 2010 |
| Gazli-Shymkent Gas PipelineGazli → Shymkent | Uzbekistan, Kazakhstan | Operating | 309 km | 13.5 bcm/y | 1 | 1988 |
| Karachaganak-Uralsk Gas PipelineKarachaganak → Oral | Kazakhstan | Operating | 152 km | 0.5 bcm/y | 1 | 2009 |
| Karachaganak-Uralsk Gas PipelineKarachaganak → Oral | Kazakhstan | Proposed | 152 km | Not reported | 1 | 2028 |
| Kartaly-Rudny-Kostanai Gas PipelineKartaly → Kostanay | Russia, Kazakhstan | Operating | 156 km | 5.3 bcm/y | 1 | 1965 |
| Kozhasai-KS12 Gas PipelineKozhasai → KS-12 Shalkar | Kazakhstan | Operating | 168 km | Not reported | 1 | 2017 |
| Makat–North Caucasus Gas PipelineMakat → Chechen Republic | Kazakhstan, Russia | Operating | 944 km | 28 bcm/y | 1 | 1987 |
| Makat–North Caucasus PipelineKS Makat → KS Redut | Kazakhstan | Operating | 130 km | 13.2 bcm/y | 1 | 2023 |
| Okarem-Beyneu Gas PipelineEkerem → Beyneu | Turkmenistan, Kazakhstan | Operating | 999 km | 3.78 bcm/y | 1 | 1974 |
| Okarem-Beyneu Gas PipelineBeyneu → Zhanozen | Kazakhstan | Operating | 308 km | 5.8 bcm/y | 1 | 2023 |
| Orenburg-Novopskov Gas PipelineOrenburg → Novopskov | Ukraine, Kazakhstan, Russia | Operating | 1,230 km | 14.6 bcm/y | 1 | 1975 |
| Russia-Kazakhstan-China Gas PipelineBarnaul → Khorgos | Russia, Kazakhstan | Proposed | 1,000 km | 45 bcm/y | 1 | — |
| Saryarka Gas PipelineKaraozek → Astana | Kazakhstan | Operating | 1,061 km | 2.2 bcm/y | 1 | 2019 |
| Saryarka Gas PipelineAstana → Kokshetau | Kazakhstan | Proposed | 276 km | Not reported | 1 | 2028 |
| Saryarka Gas PipelineKokshetau → Petropavl | Kazakhstan | Proposed | 177 km | Not reported | 1 | 2028 |
| Sarybulak-Zimunay Gas PipelineSarybulak Gas Field → Zimunay | Kazakhstan, China | Operating | 93 km | 0.5 bcm/y | 1 | 2013 |
| Shagyrly-Shomyshty-Beyneu Gas PipelineShagyrly-Shomyshty Gas Field → Beyneu | Kazakhstan | Operating | 96 km | 1.56 bcm/y | 1 | 2015 |
| Soyuz Gas PipelineOrenburg → Uzhgorod | Russia, Ukraine, Kazakhstan | Mothballed | 2,750 km | 25.2 bcm/y | 1 | 1980 |
| Taldykorgan-Usharal Gas PipelineTaldykorgan → Usharal | Kazakhstan | Operating | 302 km | 0.39 bcm/y | 1 | 2025 |
| Tengiz-Kulsary Gas PipelineTengiz Oil and Gas Field → Kulsary | Kazakhstan | Operating | 126 km | 7.5 bcm/y | 1 | — |
| Zhanaozen-Zhetybay-Aktau Gas PipelineZhanaozen → Aktau | Kazakhstan | Operating | 149 km | 4.54 bcm/y | 1 | — |
| Zhanaozen-Zhetybay-Aktau Gas PipelineZhanaozen → Zhetybay | Kazakhstan | Operating | 61 km | 4.54 bcm/y | 1 | 2008 |
| Zhanaozen-Zhetybay-Aktau Gas PipelineZhetybay → Aktau | Kazakhstan | Operating | 71 km | 4.54 bcm/y | 1 | 1968 |
| Zhanaozen-Zhetybay-Aktau Gas PipelineZhanaozen → Aktau | Kazakhstan | Under construction | 148 km | Not reported | 1 | 2026 |
| Zhanazhol-Aktobe Gas PipelineZhanazhol → Aktobe | Kazakhstan | Operating | 244 km | 0.7 bcm/y | 1 | 1988 |
| Zhanazhol-KS13 Gas PipelineZhanazhol → Kaindy | Kazakhstan | Operating | 157 km | 5.2 bcm/y | 1 | 2006 |
| Zhetybay-Kuryk Gas PipelineZhetybay → Kuryk | Kazakhstan | Operating | 85 km | 0 bcm/y | 1 | 2022 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.