Gas transmission pipeline · Beyneu to Gubkin
Central Asia–Center Gas Pipeline
Central Asia–Center Gas Pipeline is an operating gas transmission pipeline crossing Turkmenistan, Uzbekistan, Kazakhstan and 1 more. The tracker lists 1 tracked segment, 2,600 km long and 5 bcm/y of capacity, starting up in 1975. It runs from Beyneu to Gubkin. It is owned by Gazprom PJSC.
Length
2,600 km
Capacity
5 bcm/y
3.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1220 mm (48 in)
Route
Central Asia–Center Gas Pipeline runs from Beyneu to Gubkin. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Beyneu
- To
- Gubkin
- Start country
- Turkmenistan
- End country
- Russia
- Countries crossed
- Turkmenistan, Uzbekistan, Kazakhstan, Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,565 km
- GEM pipeline ID
- P2292
- Start year
- 1975
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| CAC-3 | Operating | Beyneu → Gubkin | 2,600 | 5 | 1220 mm | 1975 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Central Java FSRU | Indonesia | Import | Cancelled | — | name match |
| Yokkaichi LNG Center | Japan | Import | Operating | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%