Gas transmission pipeline · Belek Compressor Station to Alexandrov Gay
Caspian Coastal Gas Pipeline
Caspian Coastal Gas Pipeline is a cancelled gas transmission pipeline crossing Turkmenistan, Uzbekistan, Kazakhstan and 1 more. The tracker lists 1 tracked segment, 1,996 km long and 25 bcm/y of capacity. It runs from Belek Compressor Station to Alexandrov Gay. Owners include Gazprom PJSC, Turkmengaz, Uzbekneftegaz JSC and 1 more.
Length
1,996 km
Capacity
25 bcm/y
18.4 Mtpa LNG equivalent
Segments tracked
1
Route
Caspian Coastal Gas Pipeline runs from Belek Compressor Station to Alexandrov Gay. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Belek Compressor Station
- To
- Alexandrov Gay
- Start country
- Turkmenistan
- End country
- Russia
- Countries crossed
- Turkmenistan, Uzbekistan, Kazakhstan, Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,995 km
- GEM pipeline ID
- P0740
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Belek Compressor Station → Alexandrov Gay | 1,996 | 25 | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Coastal Bend LNG Terminal | United States | Export | Proposed | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.