LNG Chain

Gas transmission pipeline · Gazli to Shymkent

Gazli-Shymkent Gas Pipeline

Gazli-Shymkent Gas Pipeline is an operating gas transmission pipeline crossing Uzbekistan, Kazakhstan. The tracker lists 1 tracked segment, 309 km long and 13.5 bcm/y of capacity, starting up in 1988. It runs from Gazli to Shymkent. It is owned by QazaqGaz.

Length

309 km

Capacity

13.5 bcm/y

9.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1220 mm (48 in)

Route

Gazli-Shymkent Gas Pipeline runs from Gazli to Shymkent. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Gazli
To
Shymkent
Start country
Uzbekistan
End country
Kazakhstan
Countries crossed
Uzbekistan, Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
574 km
GEM pipeline ID
P3956
Start year
1988
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingGazli → Shymkent30913.51220 mm1988GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies