LNG Chain

Gas transmission pipeline · Karaozek to Astana

Saryarka Gas Pipeline

Saryarka Gas Pipeline is an operating gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 1,061 km long and 2.2 bcm/y of capacity, starting up in 2019. It runs from Karaozek to Astana. It is owned by AstanaGaz KMG JSC.

Length

1,061 km

Capacity

2.2 bcm/y

1.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 820 mm (32 in)

Route

Saryarka Gas Pipeline runs from Karaozek to Astana. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Karaozek
To
Astana
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,029 km
GEM pipeline ID
P3300
Start year
2019
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase I (Kyzylorda-Zhezkazgan-Karaganda-Astana Gas Pipeline)OperatingKaraozek → Astana1,0612.2820 mm2019GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.