LNG Chain

Gas transmission pipeline · Mary to Voskresensk

Central Asia–Center Gas Pipeline

Central Asia–Center Gas Pipeline is an operating gas transmission pipeline crossing Turkmenistan, Uzbekistan, Kazakhstan and 1 more. The tracker lists 1 tracked segment, 2,662 km long and 60.2 bcm/y of capacity, starting up in 1970. It runs from Mary to Voskresensk. It is owned by Gazprom PJSC.

Length

2,662 km

Capacity

60.2 bcm/y

44.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1220 mm (48 in)

Route

Central Asia–Center Gas Pipeline runs from Mary to Voskresensk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Mary
To
Voskresensk
Start country
Turkmenistan
End country
Russia
Countries crossed
Turkmenistan, Uzbekistan, Kazakhstan, Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
2,892 km
GEM pipeline ID
P2291
Start year
1970
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
CAC-2OperatingMary → Voskresensk2,66260.21220 mm1970GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Central Java FSRUIndonesiaImportCancelledname match
Yokkaichi LNG CenterJapanImportOperatingname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies