Poland: LNG infrastructure
Poland has 2 LNG terminals and 51 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 6.1 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
no export terminal tracked
Import capacity
6.1 Mtpa
4.49 Mtpa under construction
Pipelines
51
9,096 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 2 | 6.1 | 4.49 |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Poland
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Polish Baltic Sea Coast FSRU | Import | FSRU | Under construction | 4.49 Mtpaunder construction | 2 | — |
| Świnoujście Polskie LNG TerminalWojewództwo | Import | Not reported | Operating | 6.1 Mtpa | 3 | 2016 |
Gas pipelines crossing Poland
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Baltic Pipe Project | Norway, Denmark, Sweden, Poland | Operating | 613 km | 10 bcm/y | 1 | 2022 |
| Baltic Pipe ProjectGoleniów → Ciecierzyce | Poland | Operating | 122 km | Not reported | 1 | 2022 |
| Baltic Pipe ProjectCiecierzyce → Lwówek | Poland | Operating | 69 km | Not reported | 1 | 2022 |
| Bonikowo–Lwowek Gas PipelineBonikowo → Lwowek | Poland | Operating | 156 km | Not reported | 1 | — |
| Czech-Polish Interconnector Gas Pipeline (CPI)Libhošť → Kędzierzyn | Czechia, Poland | Proposed | 207 km | Not reported | 1 | 2022 |
| Czeszów-Kiełczów Gas PipelineCzeszów → Kiełczów | Poland | Operating | 33 km | Not reported | 1 | 2018 |
| Gas Interconnection Poland-LithuaniaWysokoje → Jauniūnai | Poland, Lithuania | Operating | 508 km | 2.4 bcm/y | 1 | 2022 |
| Goleniow–Gdynia Gas PipelineGdansk → Ploty | Poland | Operating | 278 km | Not reported | 1 | — |
| Goleniow–Szczecin Gas PipelineGoleniow → Szczecin | Poland | Operating | 31 km | Not reported | 1 | — |
| Goleniów–Płoty Gas PipelineTłocznia Goleniów → Płoty | Poland | Operating | 42 km | Not reported | 1 | 2022 |
| Gustorzyn-Wronów Gas PipelineGustorzyn → Wronów | Poland | Operating | 308 km | Not reported | 1 | 2023 |
| Hermanowice-Jaroslaw PipelineHermanowice → Jarosław | Poland | Proposed | 39 km | Not reported | 1 | 2029 |
| Hermanowice-Strachocina PipelineHermanowice → Strachocina | Poland | Operating | 72 km | Not reported | 1 | 2020 |
| Holowczyce–Pulawy Gas PipelineWronow → WysokojePL | Poland | Operating | 133 km | Not reported | 1 | — |
| Jaroslaw-Rozwadów PipelineJarosław → Rozwadów | Poland | Proposed | 60 km | Not reported | 1 | 2029 |
| Kobryn-Brest-Warsaw Gas PipelineKobryn → Warsaw | Belarus, Poland | Operating | 263 km | 10 bcm/y | 1 | 1985 |
| Kędzierzyn-Racibórz Gas PipelineKędzierzyn-Koźle → Racibórz | Poland | Operating | 37 km | Not reported | 1 | 2025 |
| Lasow–Odolanow Gas PipelineLasow → Odolanow | Poland | Operating | 235 km | Not reported | 1 | — |
| Lewin Brzeski-Nysa PipelineLewin Brzeski → Opolskie Voivodeship | Poland | Proposed | 38 km | Not reported | 1 | 2020 |
| Lwówek-Odlonów Gas Pipeline | Poland | Operating | 168 km | Not reported | 1 | 2019 |
| Odolanow-Latynia Gas PipelineOdolanow → Latynia | Poland | Operating | 113 km | Not reported | 1 | — |
| Odolanow–Husow Gas PipelineOdolanow → Husow | Poland | Operating | 411 km | Not reported | 1 | — |
| Oswiecim–Pogorska Wola Gas PipelineOswiecim → PogorskaWola | Poland | Operating | 147 km | Not reported | 1 | — |
| Oświęcim-Tworzen Gas PipelineOświęcim → Tworzen | Poland | Operating | 44 km | Not reported | 1 | 2025 |
| Pelczyce-Poznan Gas PipelinePelczyce → Poznan | Poland | Operating | 211 km | Not reported | 1 | — |
| Pogórska-Wola-Tworzen Gas PipelinePogórska Wola → Tworzen | Poland | Operating | 168 km | Not reported | 1 | 2022 |
| Poland-Slovakia Gas PipelineStrachocina → Veľké Kapušany | Poland, Slovakia | Operating | 165 km | 5.7 bcm/y | 1 | 2022 |
| Poland-Ukraine Interconnector Gas PipelineHermanowice → Bliche Volytsia UGS | Poland, Ukraine | Cancelled | 110 km | 8 bcm/y | 1 | 2022 |
| Poznan-Krobia Gas PipelinePoznan → Krobia | Poland | Operating | 78 km | Not reported | 1 | — |
| Racibórz–Oświęcim Gas PipelineRacibórz → Oświęcim | Poland | Under construction | 116 km | Not reported | 1 | 2026 |
| Rembelszczyzna-Mory Gas PipelineRembelszczyzna → Mory | Poland | Operating | 29 km | 0 bcm/y | 1 | 2025 |
| Rembelszczyzna-Wronów Gas PipelineRembelszczyzna → Wronów | Poland | Proposed | 135 km | Not reported | 1 | 2029 |
| Rozwadów-Końskowola-Wronów PipelineRozwadów → Wronów | Poland | Proposed | 120 km | Not reported | 1 | 2029 |
| Rozwadów-Strachocina Gas PipelineRozwadów → Strachocina | Poland | Proposed | 160 km | Not reported | 1 | 2030 |
| Skoczów-Komorowice-Oświęcim Gas PipelineSkoczów → Oświęcim | Poland | Proposed | 58 km | Not reported | 1 | — |
| Stalowa Wola-Pogorska Wola Gas PipelineStalowa Wola → Pogorska Wola | Poland | Operating | 142 km | Not reported | 1 | — |
| Strachocina-Pogórska-Wola Gas PipelineStrachocina → Pogórska Wola | Poland | Operating | 97 km | Not reported | 1 | 2021 |
| Swinoujscie–Goleniow Gas PipelineSwinoujscie → Goleniow | Poland | Operating | 60 km | Not reported | 1 | — |
| Szczecin - Lwówek to Dolna Odra Gas PipelinePrzywodzie → Nowe Czarnowo | Poland | Operating | 63 km | Not reported | 1 | 2023 |
| Tworzen–Cieszyn Gas PipelineTworzen → Cieszyn | Poland | Operating | 92 km | Not reported | 1 | — |
| Tworóg-Tworzen Gas PipelineTworóg → Tworzen | Poland | Operating | 55 km | Not reported | 1 | 2021 |
| Tworórog-Kędzierzyn Gas PipelineTworóg → Kędzierzyn | Poland | Operating | 43 km | Not reported | 1 | 2020 |
| Volkovysk–Gosgranitza Gas PipelineVolkovysk → Białystok | Belarus, Poland | Operating | 92 km | 2 bcm/y | 1 | 1974 |
| Wloclawek–Gdynia Gas PipelineWloclawek → Gdansk | Poland | Operating | 200 km | Not reported | 1 | — |
| Wloclawek–Odolanow Gas PipelineOdolanow → Wloclawek | Poland | Operating | 166 km | Not reported | 1 | — |
| Wloclawek–Rembelszczyzna Gas PipelineWloclawek → Rembelszczyzna | Poland | Operating | 150 km | Not reported | 1 | — |
| Wronow–Husow Gas PipelineWronow → Husow | Poland | Operating | 181 km | Not reported | 1 | — |
| Wronow–Jaroslaw Gas PipelineWronow → Jaroslaw | Poland | Operating | 30 km | Not reported | 1 | — |
| Yamal Europe 2 Pipeline | Belarus, Poland, Slovakia | Cancelled | 460 km | 15 bcm/y | 1 | 2019 |
| Yamal-Europe Gas PipelineTorzhok → Frankfurt an der Oder | Russia, Belarus, Germany, Poland | Idle | 1,660 km | 33 bcm/y | 1 | 1999 |
| Zdzieszowice-Wrocław Gas PipelineZdzieszowice → Wrocław | Poland | Operating | 130 km | Not reported | 1 | 2021 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.