LNG Chain

Gas transmission pipeline · Wronow to Jaroslaw

Wronow–Jaroslaw Gas Pipeline

Wronow–Jaroslaw Gas Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 30 km long. It runs from Wronow to Jaroslaw. It is owned by Gaz-System.

Length

30 km

Capacity

Not reported

Segments tracked

1

Route

Wronow–Jaroslaw Gas Pipeline runs from Wronow to Jaroslaw. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Wronow
To
Jaroslaw
Start country
Poland
End country
Poland
Countries crossed
Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
30 km
GEM pipeline ID
P2859
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingWronow → Jaroslaw30Not reportedGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.