Import terminal · Poland
Polish Baltic Sea Coast FSRU
Polish Baltic Sea Coast FSRU is an under construction LNG import terminal (floating storage and regasification unit (FSRU)) in Poland. The tracker lists 2 tracked units with 4.49 Mtpa under construction, 3.31 Mtpa proposed. It is owned by Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo.
Operating
—
no units operating
Under construction
4.49 Mtpa
6.1 bcm/y · 1 unit
Proposed
3.31 Mtpa
4.5 bcm/y · 1 unit
At a glance
- Country
- Poland
- State / province
- Not reported
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- FSRU
- Status (rolled up)
- Under construction
- Trains / phases tracked
- 2
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 54.4247° N, 18.7358° E
- GEM terminal ID
- T100000130731
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Under construction | 4.49 | 6.1 | — | — | Not reported | Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo [100%] |
| Unit Expansion (FSRU 2) | Proposed | 3.31 | 4.5 | — | — | Not reported | Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo [100%] |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Under construction | 1 | 4.49 | 6.1 |
| Proposed | 1 | 3.31 | 4.5 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Polish Baltic Sea Coast FSRU at 54.4247° N, 18.7358° E, with 7 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 54.4247° N, 18.7358° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Goleniow–Gdynia Gas Pipeline | Operating | 278 km | — | 10.4 km | route proximity |
| Wloclawek–Gdynia Gas Pipeline | Operating | 200 km | — | 10.7 km | route proximity |
| Baltic Gas Interconnector | Cancelled | 200 km | 3 bcm/y | — | name match |
| Baltic Pipe Project | Operating | 613 km | 10 bcm/y | — | name match |
| Baltic Pipe Project | Operating | 122 km | — | — | name match |
| Baltic Pipe Project | Operating | 69 km | — | — | name match |
| Czech-Polish Interconnector Gas Pipeline (CPI) | Proposed | 207 km | — | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.