By status
Idle LNG infrastructure
7 LNG terminals in 6 countries totalling 33.9 Mtpa and 8 gas pipelines totalling 2,936 km are idle. Terminals are sorted by capacity, pipelines by length, vessels by cargo capacity.
7 idle LNG terminals
| Import / export | Type | Units | |||||
|---|---|---|---|---|---|---|---|
| Mina Al-Ahmadi LNG TerminalAl Ahmadi | Kuwait | Import | Not reported | Idle | 9.6 Mtpa | 2 | 2009 |
| Northeast Gateway LNG TerminalMassachusetts | United States | Import | Not reported | Idle | 6.08 Mtpa | 1 | 2008 |
| Terminal Gás Sul FSRUSanta Catarina | Brazil | Import | FSRU | Idle | 6 Mtpa | 1 | 2024 |
| Aqaba Jordan FSRUAqaba | Jordan | Import | FSRU | Idle | 3.8 Mtpa | 1 | 2015 |
| Hadera FSRU TerminalSharon | Israel | Import | FSRU | Idle | 3.8 Mtpa | 1 | 2013 |
| Marshal Vasilevskiy FSRUKaliningrad Oblast | Russia | Import | FSRU | Idle | 3.76 Mtpa | 1 | 2019 |
| Vysotsk LNG TerminalLeningrad Oblast | Russia | Export | Not reported | Idle | 0.82 Mtpa | 3 | 2019 |
8 idle gas pipelines
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Yamal-Europe Gas PipelineTorzhok → Frankfurt an der Oder | Russia, Belarus, Germany, Poland | Idle | 1,660 km | 33 bcm/y | 1 | 1999 |
| Bayu-Undan to Darwin PipelineTimor Sea → Darwin | Australia | Idle | 502 km | 4.75 bcm/y | 1 | 2005 |
| Guaymas-El Oro PipelineGuaymas → El Oro | Mexico | Idle | 331 km | 5.3 bcm/y | 1 | 2017 |
| Yemen LNG Gas PipelineSafer → Balhaf | Yemen | Idle | 320 km | 11.7 bcm/y | 1 | 2009 |
| ANR Gas PipelineWest Cameron Block 167 → Grand Chenier liquids handling facility | United States | Idle | 64 km | 7.39 bcm/y | 1 | — |
| UTOS Gas PipelineGulf of Mexico → Johnson's Bayou | United States | Idle | 47 km | 20.4 bcm/y | 1 | 1978 |
| Port Kembla Pipeline ProjectSpringhill Road → Kembla Grange Meter Station | Australia | Idle | 7.8 km | 4.87 bcm/y | 1 | 2023 |
| Port Kembla Pipeline ProjectPort Kembla → Springhill Road | Australia | Idle | 4.3 km | 4.87 bcm/y | 1 | 2023 |