LNG Chain

Gas transmission pipeline · Oświęcim to Tworzen

Oświęcim-Tworzen Gas Pipeline

Oświęcim-Tworzen Gas Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 44 km long, starting up in 2025. It runs from Oświęcim to Tworzen. It is owned by Gaz-System.

Length

44 km

Capacity

Not reported

Segments tracked

1

Largest diameter 700 mm (28 in)

Route

Oświęcim-Tworzen Gas Pipeline runs from Oświęcim to Tworzen. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Oświęcim
To
Tworzen
Start country
Poland
End country
Poland
Countries crossed
Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
37 km
GEM pipeline ID
P2721
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingOświęcim → Tworzen44Not reported700 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.