Country
Spain: LNG infrastructure
Spain has 10 LNG terminals and 61 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 62.4 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
no export terminal tracked
Import capacity
62.4 Mtpa
operating regasification
Pipelines
61
23,233 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 10 | 62.4 | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Spain
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Barcelona LNG TerminalCatalonia | Import | Not reported | Operating | 17.1 Mtpa | 1 | 1969 |
| Bilbao LNG TerminalBiscay | Import | Not reported | Operating | 5.15 Mtpa | 1 | 2003 |
| Cartagena LNG Terminal (Spain)Province of Murcia | Import | Not reported | Operating | 11.8 Mtpa | 1 | 1989 |
| El Musel LNG TerminalAsturias | Import | Not reported | Operating | 5.15 Mtpa | 1 | 2023 |
| Gran Canaria LNG TerminalLas Palmas | Import | Not reported | Cancelled | Not reported | 1 | — |
| Huelva LNG TerminalAndalusia | Import | Not reported | Operating | 11.8 Mtpa | 1 | 1988 |
| Mugardos LNG TerminalGalicia | Import | Not reported | Operating | 2.65 Mtpa | 2 | 2007 |
| Puerto de la Luz LNG TerminalCanarias | Import | Not reported | Cancelled | Not reported | 1 | — |
| Sagunto LNG TerminalValencia | Import | Not reported | Operating | 8.76 Mtpa | 1 | 2006 |
| Tenerife LNG TerminalSanta Cruz de Tenerife | Import | Not reported | Cancelled | Not reported | 1 | — |
Gas pipelines crossing Spain
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Al Ándalus Gas PipelineTarifa → Spain | Spain | Operating | 884 km | 12 bcm/y | 1 | 1996 |
| Alcazar de San Juan-Yela Gas PipelineAlcazar de San Juan → Yela | Spain | Operating | 174 km | Not reported | 1 | 2000 |
| Algete-Haro Gas Pipeline | Spain | Operating | 892 km | Not reported | 1 | 1986 |
| Algete-Yela Gas PipelineAlgete → Yela | Spain | Operating | 89 km | Not reported | 1 | 2011 |
| Almería-Chinchilla Gas PipelineAlmeria → Chinchilla | Spain | Operating | 336 km | Not reported | 1 | 2009 |
| Aranda–Soria Gas PipelineAranda → Soria | Spain | Operating | 126 km | Not reported | 1 | 2001 |
| Baleares Gas PipelineMontesa → Palma de Mallorca | Spain | Operating | 335 km | Not reported | 1 | 2008 |
| Banyeres–Tamarite Gas PipelineBanyeres → Tamarite | Spain | Operating | 130 km | Not reported | 1 | — |
| Bilbao–Villapresente Gas PipelineBilbao → Villapresente | Spain | Operating | 103 km | Not reported | 1 | 1988 |
| Burgos–Valladolid Gas PipelineValladolid → Burgos | Spain | Operating | 96 km | Not reported | 1 | 1987 |
| Castelnou-Villar de Arnedo-Haro Gas PipelineCastelnou → Haro | Spain | Operating | 278 km | Not reported | 1 | 1979 |
| Castelnou–Tamarite Gas PipelineCastelnou → Tamarite | Spain | Operating | 108 km | Not reported | 1 | 2005 |
| Cordoba–Alcazar De San Juan Gas PipelineCordoba → Alcazar de San Juan | Spain | Operating | 255 km | Not reported | 1 | 2004 |
| Cordoba–Campo Major PipelineCordoba → Campo Major | Spain | Operating | 251 km | Not reported | 1 | 1996 |
| Cordoba–Puertollano Gas PipelineCordoba → Puertollano | Spain | Operating | 104 km | Not reported | 1 | — |
| Eje Levante Gas Pipeline | Spain | Operating | 368 km | Not reported | 1 | 1996 |
| Eje Levante Gas PipelineCartagena → Lorca | Spain | Operating | 62 km | Not reported | 1 | 2002 |
| Eje Levante Gas PipelineOrihuela → Totana | Spain | Operating | 79 km | Not reported | 1 | 2005 |
| Eje Levante Gas PipelinePaterna → Castellon de la Plana | Spain | Operating | 158 km | Not reported | 1 | 2006 |
| Eje Transversal Gas PipelineMontesa → Alcazar de San Juan | Spain | Operating | 268 km | Not reported | 1 | 2008 |
| Getafe-Zarza de Tajo-Cuenca Gas PipelineGetafe → Fuentes | Spain | Operating | 172 km | Not reported | 1 | 2002 |
| Green Hysland PipelineCas Tresorer → Lloseta | Spain | Operating | 3.2 km | Not reported | 1 | 2024 |
| Guitiriz-Lugo Gas PipelineGuitiriz → Begonte | Spain | Operating | 28 km | Not reported | 1 | 2012 |
| H2Med PipelineBarcelona → Marseille | Spain, France | Proposed | 450 km | 2.72 bcm/y | 1 | 2029 |
| Huelva-Córdoba Gas PipelineHuelva → Cordoba | Spain | Operating | 494 km | Not reported | 1 | 1988 |
| Irun-Biriatou Gas PipelineIrun → Biriatou | Spain, France | Operating | 4 km | 11.3 bcm/y | 1 | — |
| Lacq–Larrau Gas PipelineNavarra → Lacq | Spain | Operating | 108 km | 5.96 bcm/y | 1 | 2013 |
| Larrau–Villar de Arnedo Gas PipelineLarrau → El Villar de Arnedo | France, Spain | Operating | 145 km | Not reported | 1 | 2007 |
| Madrid–Algete Gas PipelineMadrid → Algete | Spain | Operating | 44 km | Not reported | 1 | — |
| Maghreb-Europe Gas PipelineHassi R'Mel → Cordoba | Algeria, Morocco, Spain, Portugal | Operating | 1,350 km | 12 bcm/y | 1 | 1996 |
| Martorell–Figueres Gas PipelineBarcelona → Girona | Spain | Operating | 94 km | Not reported | 1 | 2012 |
| Medgaz Gas PipelineHassi R'Mel → Andalucía | Algeria, Spain | Operating | 210 km | 8 bcm/y | 1 | 2011 |
| Midi-Catalonia Pipeline | Spain, France | Cancelled | 1,250 km | 7.5 bcm/y | 1 | 2022 |
| Midi-Catalonia PipelineHostalric → Bairba | Spain, France | Cancelled | 227 km | Not reported | 1 | 2024 |
| Nigeria-Morocco Gas PipelineLagos → Tangiers | Nigeria, Benin, Togo, Ghana, Côte d'Ivoire, Liberia, Sierra Leone, Guinea, Guinea-Bissau, Gambia, Senegal, Mauritania, Morocco, Spain | Proposed | 5,660 km | 30 bcm/y | 1 | 2046 |
| Oviedo–Tuy Gas PipelineOviedo → Tuy | Spain | Operating | 373 km | Not reported | 1 | 1998 |
| Paterna-Tivissa Gas PipelinePaterna → Tivissa | Spain | Operating | 226 km | Not reported | 1 | 1980 |
| País Vasco Gas PipelineHaro → Bermeo | Spain | Operating | 267 km | Not reported | 1 | 1980 |
| Persian Gas Pipeline | Iran, Türkiye, Greece, Italy, Switzerland, Austria, Germany, France, Spain | Cancelled | 3,300 km | 40 bcm/y | 1 | — |
| Puertollano–Madrid Gas PipelinePuertollano → Madrid | Spain | Operating | 240 km | Not reported | 1 | — |
| Reganosa Gas PipelineGuitriz → As Pontes | Spain | Operating | 40 km | Not reported | 1 | 2007 |
| Reganosa Gas PipelineAs Pontes → Mugardos | Spain | Operating | 30 km | Not reported | 1 | 2007 |
| Reganosa Gas PipelineMugardos → Abegondo | Spain | Operating | 45 km | Not reported | 1 | 2007 |
| Reganosa Gas PipelineAbegondo → Sabón | Spain | Operating | 25 km | Not reported | 1 | 2007 |
| Robregordo-Segovia-Avila Gas PipelinePalazuelos de Eresma → Vicolozano | Spain | Operating | 79 km | Not reported | 1 | 2011 |
| Ruta de la Plata Gas PipelineAlmendralejo → Oviedo | Spain | Operating | 597 km | Not reported | 1 | 1998 |
| Ruta de la Plata Gas PipelineVillamañán → Ponferrada | Spain | Operating | 80 km | Not reported | 1 | 2001 |
| Ruta de la Plata Gas PipelineLa Robla → Guardo | Spain | Operating | 59 km | Not reported | 1 | 2004 |
| Spain-Italy Offshore Interconnector | Spain, Italy | Shelved | 700 km | 30 bcm/y | 1 | — |
| Spain-Portugal Interconnector Gas PipelineZamora → Portuguese | Spain, Portugal | Cancelled | 86 km | Not reported | 1 | — |
| Tamarite–Serrablo Gas PipelineTamarite → Serrablo | Spain | Operating | 119 km | Not reported | 1 | — |
| Tivissa-Barcelona Gas PipelineBarcelona → Tivissa | Spain | Operating | 427 km | Not reported | 1 | 1979 |
| Tivissa–Castelnou Gas PipelineTivissa → Castelnou | Spain | Operating | 91 km | Not reported | 1 | 1979 |
| Valladolid–Aranda Gas PipelineAranda → Valladolid | Spain | Operating | 87 km | Not reported | 1 | 1990 |
| Vergara-Irun Gas PipelineVergara → Irun | Spain | Operating | 89 km | Not reported | 1 | 1984 |
| Villapresente-Burgos Gas PipelineVillapresente → Burgos | Spain | Operating | 140 km | Not reported | 1 | 1988 |
| Villapresente–Oviedo Gas PipelineOviedo → Santander | Spain | Operating | 145 km | Not reported | 1 | — |
| Villar de Arnedo–Haro Gas PipelineVillar de Arnedo → Haro | Spain | Operating | 76 km | Not reported | 1 | 1979 |
| Yela–Villar de Arnedo Gas PipelineYela → El Villar de Arnedo | Spain | Operating | 251 km | Not reported | 1 | 2012 |
| Zamora–Valladolid Gas PipelineValladolid → Zamora | Spain | Operating | 79 km | Not reported | 1 | 1990 |
| Zaragoza–Serrablo Gas PipelineZaragoza → Huesca | Spain | Operating | 247 km | Not reported | 1 | 1983 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.