Gas transmission pipeline · Paterna to Tivissa
Paterna-Tivissa Gas Pipeline
Paterna-Tivissa Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 226 km long, starting up in 1980. It runs from Paterna to Tivissa. It is owned by Gas Connect Austria GmbH.
Length
226 km
Capacity
Not reported
Segments tracked
1
Largest diameter 660 mm (26 in)
Route
Paterna-Tivissa Gas Pipeline runs from Paterna to Tivissa. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Paterna
- To
- Tivissa
- Start country
- Spain
- End country
- Spain
- Countries crossed
- Spain
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 203 km
- GEM pipeline ID
- P1655
- Start year
- 1980
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Paterna → Tivissa | 226 | Not reported | 660 mm | 1980 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Sagunto LNG Terminal | Spain | Import | Operating | 8.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Verbund AG51%
- Allianz SE29.4%
- Snam SpA19.6%