LNG Chain

Gas transmission pipeline · Hostalric to Bairba

Midi-Catalonia Pipeline

Midi-Catalonia Pipeline is a cancelled gas transmission pipeline crossing Spain, France. The tracker lists 1 tracked segment, 227 km long, starting up in 2024. It runs from Hostalric to Bairba. It is owned by Enagás SA and Teréga.

Length

227 km

Capacity

Not reported

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Midi-Catalonia Pipeline runs from Hostalric to Bairba. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Hostalric
To
Bairba
Start country
Spain
End country
France
Countries crossed
Spain, France
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
173 km
GEM pipeline ID
P3378
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
South Transit East Pyranees (STEP) Gas PipelineCancelledHostalric → Bairba227Not reported914 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.