LNG Chain

Gas transmission pipeline · Cas Tresorer to Lloseta

Green Hysland Pipeline

Green Hysland Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 3 km long, starting up in 2024. It runs from Cas Tresorer to Lloseta. Owners include Enagás SA, Acciona S.A, CEMEX SAB de CV and 1 more.

Length

3.2 km

Capacity

Not reported

Segments tracked

1

Route

Green Hysland Pipeline runs from Cas Tresorer to Lloseta. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Cas Tresorer
To
Lloseta
Start country
Spain
End country
Spain
Countries crossed
Spain
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
23 km
GEM pipeline ID
P4425
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingCas Tresorer → Lloseta3.2Not reported2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.