LNG Chain

Gas transmission pipeline · Aranda to Soria

Aranda–Soria Gas Pipeline

Aranda–Soria Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 126 km long, starting up in 2001. It runs from Aranda to Soria. It is owned by Enagás SA.

Length

126 km

Capacity

Not reported

Segments tracked

1

Largest diameter 992149 mm (39061 in)

Route

Aranda–Soria Gas Pipeline runs from Aranda to Soria. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Aranda
To
Soria
Start country
Spain
End country
Spain
Countries crossed
Spain
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
110 km
GEM pipeline ID
P2767
Start year
2001
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingAranda → Soria126Not reported992149 mm2001GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies