Export terminal · Trinidad and Tobago
Atlantic LNG Terminal
Atlantic LNG Terminal is an operating LNG export terminal in Trinidad and Tobago. The tracker lists 5 tracked units with 12 Mtpa operating, the earliest starting in 1999. Ownership is not reported.
Operating
12 Mtpa
16.3 bcm/y · 3 units
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- Trinidad and Tobago
- State / province
- Not reported
- Region
- Not reported
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Operating
- Trains / phases tracked
- 5
- Earliest start year
- 1999
- Latest start year
- 2007
- Coordinates
- 10.1811° N, 61.6919° W
- GEM terminal ID
- T100000130579
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit T1 | Mothballed | 3.3 | 4.49 | 1999 | — | Not reported | Not reported |
| Unit T2 | Operating | 3.4 | 4.62 | 2002 | — | Not reported | Not reported |
| Unit T3 | Operating | 3.4 | 4.62 | 2003 | — | Not reported | Not reported |
| Unit T4 | Operating | 5.2 | 7.07 | 2007 | — | Not reported | Not reported |
| Unit T5 | Cancelled | Not reported | Not reported | — | — | Not reported | Not reported |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 3 | 12 | 16.3 |
| Mothballed | 1 | 3.3 | 4.49 |
| Cancelled | 1 | Not reported | Not reported |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Operators
Location
Atlantic LNG Terminal at 10.1811° N, 61.6919° W, with 8 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 10.1811° N, 61.6919° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Beachfield-Point Fortin Gas Pipeline | Operating | 80 km | — | 0 km | route proximity |
| Cross Island Pipeline | Operating | 77 km | 24.53 bcm/y | 0 km | route proximity |
| NCMA Development Gas Pipeline | Operating | 107 km | 5.31 bcm/y | 0 km | route proximity |
| Union Gas Pipeline | Operating | 6 km | 2.25 bcm/y | 7.5 km | route proximity |
| Penal-Port of Spain Gas Pipeline | Operating | 66 km | — | 24.3 km | route proximity |
| Atlantic Coast Gas Pipeline | Cancelled | 966 km | 15.33 bcm/y | — | name match |
| Atlantic Coast Gas Pipeline | Cancelled | 61 km | 15.33 bcm/y | — | name match |
| Atlantic Sunrise Gas Pipeline | Operating | 318 km | 17.37 bcm/y | — | name match |
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| East Asia | Panama Canal | — |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.