Country
Trinidad and Tobago: LNG infrastructure
Trinidad and Tobago has 1 LNG terminal and 18 tracked gas pipelines in the Global Energy Monitor tracker. It is a net exporter, with 12 Mtpa of operating liquefaction capacity and no operating import capacity.
Export capacity
12 Mtpa
operating liquefaction
Import capacity
—
no import terminal tracked
Pipelines
18
2,885 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 1 | 12 | — |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Trinidad and Tobago
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Atlantic LNG Terminal | Export | Not reported | Operating | 12 Mtpa | 5 | 1999 |
Gas pipelines crossing Trinidad and Tobago
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Angelin Gas Pipeline | Trinidad and Tobago | Operating | 21 km | 6.13 bcm/y | 1 | 2019 |
| Beachfield-Point Fortin Gas PipelineBeachfield → Atlantic LNG Terminal | Trinidad and Tobago | Operating | 80 km | Not reported | 1 | 1998 |
| Beachfield-Point Lisas 30" Gas PipelineBeachfield → Point Lisas | Trinidad and Tobago | Operating | 66 km | 6.13 bcm/y | 1 | 1982 |
| Beachfield-Point Lisas 36" Gas PipelineBeachfield → Point Lisas | Trinidad and Tobago | Operating | 97 km | Not reported | 1 | 1999 |
| Bombax Gas PipelineCassia B offshore platform → Beachfield | Trinidad and Tobago | Operating | 62 km | Not reported | 1 | 2003 |
| Cross Island PipelineBeachfield → Atlantic LNG Terminal | Trinidad and Tobago | Operating | 77 km | 24.5 bcm/y | 1 | 2005 |
| Dragon Gas PipelineDragon gas field → Hibiscus platform | Trinidad and Tobago, Venezuela | Proposed | 22 km | 3.58 bcm/y | 1 | 2020 |
| ECMA Development Gas PipelineDolphin Deep field → Beachfield gas field | Trinidad and Tobago | Operating | 97 km | 2.81 bcm/y | 1 | 2006 |
| Grenada to Trinidad and Tobago Gas Pipeline | Grenada, Trinidad and Tobago | Cancelled | 165 km | Not reported | 1 | — |
| Inter-Caribbean Natural Gas PipelineScarborough → Pointe-a-Pitre | Trinidad and Tobago, Barbados, Martinique, Guadeloupe | Cancelled | 959 km | 1.53 bcm/y | 1 | — |
| Loran-Manatee-Beachfield Gas PipelineLoran-Manatee field → Beachfield | Trinidad and Tobago, Venezuela | Proposed | 110 km | Not reported | 1 | 2027 |
| Mahogany-Beachfield Gas PipelineMahogany field → Beachfield | Trinidad and Tobago | Operating | 101 km | Not reported | 1 | 1998 |
| NCMA Development Gas PipelineHibiscus Field → Atlantic LNG Terminal | Trinidad and Tobago | Operating | 107 km | 5.31 bcm/y | 1 | 2001 |
| North-Eastern Offshore Gas PipelineWoodside Gas Export Platform, Greater Angostura Field → Beachfield | Trinidad and Tobago | Operating | 94 km | 12.3 bcm/y | 1 | 2011 |
| Penal-Port of Spain Gas PipelinePenal → Port of Spain | Trinidad and Tobago | Operating | 66 km | Not reported | 1 | 1963 |
| Suriname to Trinidad and Tobago Gas Pipeline | Suriname, Trinidad and Tobago | Proposed | 700 km | Not reported | 1 | — |
| Tobago Gas PipelineAngostura field → Industrial Estate | Trinidad and Tobago | Operating | 55 km | 1.22 bcm/y | 1 | 2012 |
| Union Gas PipelinePablito Trace (near Grant Trace) → Union Industrial Estate | Trinidad and Tobago | Operating | 6 km | 2.25 bcm/y | 1 | 2011 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.