Gas transmission pipeline · Penal to Port of Spain
Penal-Port of Spain Gas Pipeline
Penal-Port of Spain Gas Pipeline is an operating gas transmission pipeline in Trinidad and Tobago. The tracker lists 1 tracked segment, 66 km long, starting up in 1963. It runs from Penal to Port of Spain. It is owned by National Gas Co of Trinidad and Tobago.
Length
66 km
Capacity
Not reported
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Penal-Port of Spain Gas Pipeline runs from Penal to Port of Spain. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Penal
- To
- Port of Spain
- Start country
- Trinidad and Tobago
- End country
- Trinidad and Tobago
- Countries crossed
- Trinidad and Tobago
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 71 km
- GEM pipeline ID
- P7920
- Start year
- 1963
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Penal → Port of Spain | 66 | Not reported | 406 mm | 1963 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Atlantic LNG Terminal | Trinidad and Tobago | Export | Operating | 24.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.