LNG Chain

Country

Jordan: LNG infrastructure

Jordan has 2 LNG terminals and 7 tracked gas pipelines in the Global Energy Monitor tracker. Nothing is operating yet, but 5.47 Mtpa is under construction, all of it regasification for import.

Export capacity

no export terminal tracked

Import capacity

5.47 Mtpa under construction

Pipelines

7

2,949 km tracked

Fleet

0

0 flagged, 0 owned from here

Import and export balance

DirectionTerminalsOperatingUnder construction
Export (liquefaction)0
Import (regasification)25.47

Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.

LNG terminals in Jordan

Import / exportTypeUnits
Aqaba Jordan FSRUAqabaImportFSRUIdle3.8 Mtpa12015
Sheikh Sabah LNG TerminalImportNot reportedUnder construction5.47 Mtpaunder construction1

Gas pipelines crossing Jordan

Any pipeline whose country list includes this country, including transit pipelines that only pass through.

CountriesSegments
Arab Gas PipelineTaba → AqabaEgypt, JordanOperating18 km10.3 bcm/y12003
Arab Gas PipelineAqaba → RihabJordanOperating393 km10.3 bcm/y12005
Arab Gas PipelineRihab → Jaber (Jordanian-Syrian Border)JordanOperating30 km10.3 bcm/y12007
Arab Gas PipelineJaber → HomsJordan, SyriaOperating324 km10.3 bcm/y12008
Israel Jordan Gas PipelineIsrael, JordanOperating65 kmNot reported12020
Israel Natural Gas Transmission SystemIsrael, JordanOperating619 km15 bcm/y12011
Qatar-Turkey Gas PipelineNorth Field → Nabucco PipelineQatar, Saudi Arabia, Jordan, Syria, TürkiyeCancelled1,500 kmNot reported1

Chokepoint exposure

Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.