LNG Chain

Gas transmission pipeline · Aqaba to Rihab

Arab Gas Pipeline

Arab Gas Pipeline is an operating gas transmission pipeline in Jordan. The tracker lists 1 tracked segment, 393 km long and 10.3 bcm/y of capacity, starting up in 2005. It runs from Aqaba to Rihab. It is owned by Jordanian Egyptian Fajr Natural Gas Co.

Length

393 km

Capacity

10.3 bcm/y

7.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Arab Gas Pipeline runs from Aqaba to Rihab. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Aqaba
To
Rihab
Start country
Jordan
End country
Jordan
Countries crossed
Jordan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
387 km
GEM pipeline ID
P7511
Start year
2005
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Aqaba-Rihab Gas PipelineOperatingAqaba → Rihab39310.3914 mm2005GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Sheikh Sabah LNG TerminalJordanImportUnder construction1.5 kmroute proximity
Aqaba Jordan FSRUJordanImportIdle1.9 kmroute proximity
Eilat FLNG TerminalIsraelExportCancelled8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.