Country
Greece: LNG infrastructure
Greece has 6 LNG terminals and 23 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 9.14 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
no export terminal tracked
Import capacity
9.14 Mtpa
operating regasification
Pipelines
23
11,688 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 6 | 9.14 | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Greece
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Alexandroupolis FSRU | Import | FSRU | Operating | 4.04 Mtpa | 1 | 2024 |
| Argo FSRU | Import | FSRU | Shelved | Not reported | 1 | — |
| Dioriga FSRU | Import | FSRU | Proposed | 1.84 Mtpaproposed | 1 | — |
| Revithoussa LNG TerminalAttica | Import | Not reported | Operating | 5.1 Mtpa | 1 | 2000 |
| Thessaloniki FSRU | Import | FSRU | Proposed | 3.79 Mtpaproposed | 1 | — |
| Thrace FSRU | Import | FSRU | Proposed | 4.41 Mtpaproposed | 1 | — |
Gas pipelines crossing Greece
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Alexandroupolis INGS Terminal PipelineAlexandroupolis → Amfitriti | Greece | Operating | 28 km | 8.3 bcm/y | 1 | 2024 |
| Ampelia–Bralos Gas PipelineAmpelia → Bralos | Greece | Operating | 74 km | Not reported | 1 | — |
| Ampelia–Volvos Gas PipelineAmpelia → Volos | Greece | Operating | 50 km | Not reported | 1 | — |
| Bralos–Aliartos Gas PipelineBralos → Aliartos | Greece | Operating | 95 km | Not reported | 1 | — |
| EastMed Gas Pipeline | Israel, Cyprus, Greece | Proposed | 165 km | 10 bcm/y | 1 | 2025 |
| Gas Interconnector Greece–Bulgaria (IGB)Komotini → Stara Zagora | Greece, Bulgaria | Operating | 184 km | 3 bcm/y | 1 | 2022 |
| Greece-Italy Interconnector Gas Pipeline | Greece, Italy | Operating | 800 km | Not reported | 1 | 2010 |
| High Pressure Pipeline to West MacedoniaTrikala → Ptolemaida | Greece | Under construction | 157 km | Not reported | 1 | 2025 |
| Karperi-Komotini Gas PipelineKarperi → Komotini | Greece | Proposed | 215 km | 3 bcm/y | 1 | 2027 |
| Karperi–Ampelia Gas PipelineNea Messimvria → Ampelia | Greece | Operating | 181 km | Not reported | 1 | — |
| Kipi-Komotini PipelineKipi → Komotini | Türkiye, Greece | Operating | 87 km | Not reported | 1 | — |
| Komotini-Thesprotia Gas PipelineKomotini → Thesprotia | Greece | Cancelled | 620 km | Not reported | 1 | 2025 |
| Kulata-Nea Missivria Gas PipelineKulata → Nea Missivria | Bulgaria, Greece | Operating | 92 km | Not reported | 1 | — |
| Megalopoli-Patras Gas PipelineMegalopoli → Patras | Greece | Proposed | 145 km | Not reported | 1 | 2027 |
| North Macedonia–Greece Interconnector Gas PipelineNea Messimvria → Evzoni | Greece, North Macedonia | Proposed | 54 km | 1.5 bcm/y | 1 | 2027 |
| North Macedonia–Greece Interconnector Gas Pipeline | North Macedonia, Greece | Under construction | 68 km | 1.5 bcm/y | 1 | 2027 |
| Persian Gas Pipeline | Iran, Türkiye, Greece, Italy, Switzerland, Austria, Germany, France, Spain | Cancelled | 3,300 km | 40 bcm/y | 1 | — |
| Poseidon Gas PipelineFlorovouni → Otranto | Greece, Italy | Proposed | 210 km | 12 bcm/y | 1 | 2027 |
| South Stream Gas PipelineAnapa → Tarvisio and Baumgarten an der March | Russia, Bulgaria, Serbia, Hungary, Croatia, Slovakia, Slovenia, Austria, Greece, Italy | Cancelled | 2,380 km | 63 bcm/y | 1 | — |
| Tesla Gas PipelineLüleburgaz → Baumgarten an der March | Türkiye, Greece, Serbia, Hungary, Austria | Cancelled | 1,400 km | 27 bcm/y | 1 | 2019 |
| Thiva-Megalopoli Gas PipelineThiva → Megalopoli | Greece | Operating | 208 km | Not reported | 1 | — |
| Trans-Adriatic Gas Pipeline | Türkiye, Greece, Albania, Italy | Operating | 878 km | 10 bcm/y | 1 | 2020 |
| Turkey-Greece-Italy Interconnector Gas Pipeline (ITGI)Karacabey → Komotini | Türkiye, Greece | Operating | 296 km | 11 bcm/y | 1 | 2007 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.