Alexandroupolis INGS Terminal Pipeline

Alexandroupolis INGS Terminal Pipeline is an operating gas transmission pipeline in Greece. The tracker lists 1 tracked segment, 28 km long and 8.3 bcm/y of capacity, starting up in 2024. It runs from Alexandroupolis to Amfitriti. It is owned by Gastrade.

Length

28 km

Capacity

8.3 bcm/y

6.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 762 mm (30 in)

Route

Alexandroupolis INGS Terminal Pipeline runs from Alexandroupolis to Amfitriti. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Alexandroupolis
To
Amfitriti
Start country
Greece
End country
Greece
Countries crossed
Greece
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
28 km
GEM pipeline ID
P3137
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingAlexandroupolis → Amfitriti288.3762 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Thrace FSRUGreeceImportProposed0 kmroute proximity
Alexandroupolis FSRUGreeceImportOperating1.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.