LNG Chain

Gas transmission pipeline · Lüleburgaz to Baumgarten an der March

Tesla Gas Pipeline

Tesla Gas Pipeline is a cancelled gas transmission pipeline crossing Türkiye, Greece, Serbia and 2 more. The tracker lists 1 tracked segment, 1,400 km long and 27 bcm/y of capacity, starting up in 2019. It runs from Lüleburgaz to Baumgarten an der March. Owners include FGSZ, Srbijagas, MER JSC Skopje and 1 more.

Length

1,400 km

Capacity

27 bcm/y

19.9 Mtpa LNG equivalent

Segments tracked

1

Route

Tesla Gas Pipeline runs from Lüleburgaz to Baumgarten an der March. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Lüleburgaz
To
Baumgarten an der March
Start country
Türkiye
End country
Austria
Countries crossed
Türkiye, Greece, Serbia, Hungary, Austria
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,622 km
GEM pipeline ID
P0762
Start year
2019
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledLüleburgaz → Baumgarten an der March1,400272019GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Alexandroupolis FSRUGreeceImportOperating12 kmroute proximity
Thrace FSRUGreeceImportProposed13.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.