Gas transmission pipeline · Trikala to Ptolemaida
High Pressure Pipeline to West Macedonia
High Pressure Pipeline to West Macedonia is an under construction gas transmission pipeline in Greece. The tracker lists 1 tracked segment, 157 km long, starting up in 2025. It runs from Trikala to Ptolemaida. It is owned by DESFA SA.
Length
157 km
Capacity
Not reported
Segments tracked
1
Largest diameter 762 mm (30 in)
Route
High Pressure Pipeline to West Macedonia runs from Trikala to Ptolemaida. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Trikala
- To
- Ptolemaida
- Start country
- Greece
- End country
- Greece
- Countries crossed
- Greece
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 94 km
- GEM pipeline ID
- P4361
- Start year
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | Trikala → Ptolemaida | 157 | Not reported | 762 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Thessaloniki FSRU | Greece | Import | Proposed | 23.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- DESFA SA100%
Parent companies
- Snam SpA36.2%
- Government of Greece34%
- Enagas Internacional SLU12.1%
- Fluxys Europe SA12.1%
- DAMCO Energy SA6.7%