Import terminal · Louisiana, United States
Creole Trail LNG Terminal
Creole Trail LNG Terminal is a cancelled LNG import terminal in Louisiana, United States. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Cheniere Energy.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- United States
- State / province
- Louisiana
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 29.8500° N, 93.2000° W
- GEM terminal ID
- T100000130645
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 27 | 36.7 | — | — | Not reported | Cheniere Energy Inc [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 27 | 36.7 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Cheniere Energy100%
Location
Creole Trail LNG Terminal at 29.8500° N, 93.2000° W, with 15 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 29.8500° N, 93.2000° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Natural Gas Pipeline Company of America System | Operating | 14,645 km | 16.35 bcm/y | 3 km | route proximity |
| ANR Gas Pipeline | Operating | 2,897 km | 61.32 bcm/y | 3.4 km | route proximity |
| CP Express Pipeline | Under construction | 147 km | 40.88 bcm/y | 4.5 km | route proximity |
| Kinetica Energy Express | Operating | 1,139 km | — | 4.7 km | route proximity |
| TransCameron Pipeline | Operating | 39 km | 19.42 bcm/y | 7.2 km | route proximity |
| Bridgeline Gas Pipeline | Operating | 1,585 km | 9.4 bcm/y | 7.9 km | route proximity |
| Columbia Gulf Transmission Pipeline | Operating | 5,360 km | — | 8.4 km | route proximity |
| Gulf South Gas Pipeline | Operating | 12,070 km | 27.59 bcm/y | 10.1 km | route proximity |
| Creole Trail Pipeline | Operating | 151 km | 15.33 bcm/y | 11.3 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 14,202 km | 119.47 bcm/y | 15.8 km | route proximity |
| Tennessee Gas Pipeline | Operating | 18,926 km | 10.22 bcm/y | 19.1 km | route proximity |
| ANR Gas Pipeline | Idle | 64 km | 7.39 bcm/y | 21 km | route proximity |
| Texas Gas Transmission Pipeline | Operating | 9,616 km | 62.34 bcm/y | 21.5 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 10,200 km | 171.7 bcm/y | 23.8 km | route proximity |
| Creole Trail Pipeline | Cancelled | 168 km | 15.33 bcm/y | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Panama Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.