Israel: LNG infrastructure
Israel has 4 LNG terminals and 11 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
operating liquefaction
Import capacity
—
operating regasification
Pipelines
11
1,985 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 3 | — | — |
| Import (regasification) | 1 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Israel
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Eilat FLNG Terminal | Export | FLNG | Cancelled | Not reported | 1 | — |
| Hadera FSRU TerminalSharon | Import | FSRU | Idle | 3.8 Mtpa | 1 | 2013 |
| NewMed FLNG Terminal | Export | FLNG | Proposed | 4.6 Mtpaproposed | 1 | — |
| Tamar FLNG Terminal | Export | FLNG | Cancelled | Not reported | 1 | — |
Gas pipelines crossing Israel
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Ashdod–Ashkelon Gas Pipeline | Israel, Egypt | Operating | 4 km | 0.03 bcm/y | 1 | 2026 |
| Ashdod–Ashkelon Gas Pipeline | Israel, Egypt | Operating | 42 km | 0.03 bcm/y | 1 | 2026 |
| EastMed Gas Pipeline | Israel, Cyprus, Greece | Proposed | 165 km | 10 bcm/y | 1 | 2025 |
| El Arish–Ashkelon PipelineAshkelon → El Arish | Israel, Egypt | Operating | 90 km | 7 bcm/y | 1 | 2008 |
| Gas for Gaza Pipeline | Israel | Proposed | 38 km | Not reported | 1 | — |
| Israel Cyprus Gas Pipeline | Israel, Cyprus | Proposed | 215 km | 4 bcm/y | 1 | — |
| Israel Jordan Gas Pipeline | Israel, Jordan | Operating | 65 km | Not reported | 1 | 2020 |
| Israel Natural Gas Transmission System | Israel, Jordan | Operating | 619 km | 15 bcm/y | 1 | 2011 |
| Israel–Egypt Offshore Gas PipelineLeviathan platform → Idku LNG terminal | Israel, Egypt | Cancelled | 592 km | Not reported | 1 | — |
| Nitzana PipelineRamat Hovav industrial zone → Egyptian/Israeli Borders | Israel, Egypt | Under construction | 65 km | 6.13 bcm/y | 1 | 2029 |
| Ramle-Elyakim Gas PipelineRamle → Elyakim | Israel | Operating | 90 km | Not reported | 1 | 2017 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.