LNG Chain

Country

Argentina: LNG infrastructure

Argentina has 4 LNG terminals and 50 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 6.1 Mtpa of operating regasification capacity and no operating liquefaction.

Export capacity

operating liquefaction

Import capacity

6.1 Mtpa

operating regasification

Pipelines

50

27,460 km tracked

Fleet

0

0 flagged, 0 owned from here

Import and export balance

DirectionTerminalsOperatingUnder construction
Export (liquefaction)2
Import (regasification)26.1

Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.

LNG terminals in Argentina

Import / exportTypeUnits
Argentina LNG TerminalRío NegroExportNot reportedProposed27.9 Mtpaproposed4
Dock Sud LNG TerminalBuenos AiresImportNot reportedCancelledNot reported1
Escobar FSRUBuenos AiresImportFSRUOperating6.1 Mtpa12011
TGS Puerto Galván LNG TerminalBuenos AiresExportNot reportedProposed5.4 Mtpaproposed2

Gas pipelines crossing Argentina

Any pipeline whose country list includes this country, including transit pipelines that only pass through.

CountriesSegments
Anillo Gran Buenos Aires Gas PipelineBuchanan → Las HerasArgentinaOperating83 kmNot reported11999
Anillo Gran Buenos Aires Gas PipelineCañuelas → EzeizaArgentinaOperating29 kmNot reported11989
Argentina LNG Gas PipelineMeseta Buena Esperanza → Sierra GrandeArgentinaProposed527 km18.3 bcm/y12028
Atacama Gas PipelineSalta → MejionesArgentina, ChileOperating1,167 km1.97 bcm/y11999
Bioceánico Gas PipelineCampo Durán → Campo GrandeArgentina, Paraguay, BrazilProposed1,050 km3.65 bcm/y12027
Bioceánico Gas PipelineCampo Durán → Campo GrandeArgentina, Paraguay, BrazilProposed1,050 km7.3 bcm/y12030
Centro Oeste Gas PipelineLoma La Lata → San JerónimoArgentinaOperating1,121 km11.7 bcm/y11981
Chelforó-Conesa Gas PipelineChelforó → ConesaArgentinaOperating220 kmNot reported11952
Cordillerano-Patagónico Gas PipelinePlaza Huincul → ChubutArgentinaOperating940 km0.48 bcm/y11986
Cordillerano-Patagónico Gas PipelineEsquel → ChubutArgentinaOperating600 km0.37 bcm/y12006
Entrerriano Gas PipelineAldea Brasilera → ColónArgentinaOperating436 kmNot reported11998
Fénix Gas PipelineFénix platform → Vega Pléyade platformArgentinaOperating35 km3.65 bcm/y12024
GasAndes PipelineLa Mora → San BernardoArgentina, ChileOperating533 km3.94 bcm/y11997
Gasoducto Norte Gas PipelineSan Jerónimo → Campo DuránArgentinaOperating1,454 km10.2 bcm/y11960
Gasoducto de la Costa Gas PipelineEl Chourrón → Mar del PlataArgentinaOperating680 km1.68 bcm/y12004
Gasoducto del Litoral Gas PipelineColón → PaysandúArgentina, UruguayOperating27 km0.44 bcm/y11998
Gasoducto del PacificoLoma La Lata gasfield → TalcahuanoArgentina, ChileOperating670 km2.74 bcm/y11999
Juana Azurduy Gas PipelineCampo Grande (Yacuiba) → Campo DuránBolivia, ArgentinaOperating52 km0.28 bcm/y12011
La Carlota-Tío Pujio Gas PipelineLa Carlota → Tío PujioArgentinaOperating123 km5.84 bcm/y12024
Medanito-Mainqué Gas PipelineMedanito → MainquéArgentinaOperating135 kmNot reported11969
Mercedes-Cardales Gas PipelineBuenos Aires → CardalesArgentinaOperating73 km5.48 bcm/y12023
Neuba I Gas PipelineSierra Barrosa → EzeizaArgentinaOperating1,267 km4.75 bcm/y11970
Neuba II Gas PipelineLa Yegua → Las HerasArgentinaOperating1,958 km10.9 bcm/y11988
Neuba II Gas PipelineBuenos Aires → Carlos CasaresArgentinaOperating38 km1.83 bcm/y12023
NorAndino Gas PipelinePichanal compressor station → Tocopilla and MejillonesArgentina, ChileOperating1,070 km2.92 bcm/y11999
Northeast Argentina Gas PipelineSanto Tomé → Río BermejoArgentinaOperating694 km4.09 bcm/y12019
Northeast Argentina Gas PipelineRío Bermejo → IbarretaArgentinaOperating280 km4.09 bcm/y12024
Northeast Argentina Gas PipelineIbarreta → Campo DuránArgentinaShelved533 km4.09 bcm/y1
Olavarría-Barker Gas PipelineOlavarría → BarkerArgentinaOperating105 kmNot reported11972
Paraná-Uruguayana Gas PipelineParaná → UruguaianaArgentina, BrazilOperating437 km5.48 bcm/y12000
Perito Moreno Gas PipelineTratayén → SalliquelóArgentinaOperating573 km9.49 bcm/y12023
Perito Moreno Gas PipelineChacharramendi → La CarlotaArgentinaProposed280 km7.3 bcm/y1
Perito Moreno Gas PipelineTratayén → SalliquelóArgentinaProposed569 km7.3 bcm/y12027
Plaza Huincul-Senillosa Gas PipelinePlaza Huincul → SenillosaArgentinaOperating67 kmNot reported11993
Puna Gas PipelineSusques → Salar de PocitosArgentinaOperating186 km0.1 bcm/y12007
San Jerónimo-General Pacheco Gas PipelineSan Jerónimo → General PachecoArgentinaOperating294 kmNot reported1
San Jerónimo-General Rodríguez Gas PipelineSan Jerónimo → General RodríguezArgentinaOperating328 kmNot reported1
San Jerónimo-Santa Fe-Paraná Gas PipelineSan Jerónimo → Aldea BrasileraArgentinaOperating191 kmNot reported1
San Martin PipelineSan Sebastián → GutierrezArgentinaOperating4,590 km11.2 bcm/y11965
San Matías Gas PipelineTratayén → San Antonio OesteArgentinaProposed480 km9.86 bcm/y12028
San Sebastián-Ushuaia Gas PipelineSan Sebastián → UshuaiaArgentinaOperating280 kmNot reported11981
Santa Cruz Norte Gas PipelinePico Truncado → Los AntiguosArgentinaShelved320 kmNot reported1
Santa Cruz Sur Gas PipelineCampo Boleadoras → El CalafateArgentinaOperating181 km0.26 bcm/y12006
Santa Cruz Sur Gas PipelineEsperanza → El TurbioArgentinaOperating178 km0.26 bcm/y12009
Second Transmagallánico Gas PipelineCabo Espiritu Santo → Cabo VírgenesArgentinaOperating37 km2.53 bcm/y12010
Southern Cross Gas PipelineBuenos Aires → MontevideoArgentina, UruguayOperating400 km1.83 bcm/y12002
Valles Calchaquíes Gas PipelineLa Candelaria → San CarlosArgentinaProposed197 km0.18 bcm/y1
Vega Pléyade Gas PipelineVega Pléyade platform → Rio Cullen and Cañadon Alfa gas processing plantsArgentinaOperating77 km3.65 bcm/y12016
Vicuñas Gas PipelineSusques → Antofagasta de la SierraArgentinaProposed304 km1.46 bcm/y12027
Yabog Gas PipelineRío Grande → YacuíbaBolivia, ArgentinaOperating540 km2.19 bcm/y11972

Chokepoint exposure

Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.