Gas transmission pipeline · Tratayén to Salliqueló

Perito Moreno Gas Pipeline

Perito Moreno Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 573 km long and 9.49 bcm/y of capacity, starting up in 2023. It runs from Tratayén to Salliqueló. It is owned by Enarsa (Energía Argentina SA).

Length

573 km

Capacity

9.49 bcm/y

7.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Perito Moreno Gas Pipeline runs from Tratayén to Salliqueló. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tratayén
To
Salliqueló
Start country
Argentina
End country
Argentina
Countries crossed
Argentina
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
571 km
GEM pipeline ID
P1247
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase 1OperatingTratayén → Salliqueló5739.49914 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.