Gas transmission pipeline · Plaza Huincul to Chubut
Cordillerano-Patagónico Gas Pipeline
Cordillerano-Patagónico Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 940 km long and 0.48 bcm/y of capacity, starting up in 1986. It runs from Plaza Huincul to Chubut. Owners include CIESA-Compañía de Inversiones de Energía SA, ANSES-Administración Nacional de la Seguridad Social, NYSE-New York Stock Exchange and 2 more.
Length
940 km
Capacity
0.48 bcm/y
0.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 203 mm (8.0 in)
Route
Cordillerano-Patagónico Gas Pipeline runs from Plaza Huincul to Chubut. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Plaza Huincul
- To
- Chubut
- Start country
- Argentina
- End country
- Argentina
- Countries crossed
- Argentina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 1,091 km
- GEM pipeline ID
- P2711
- Start year
- 1986
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Cordillerano (North) | Operating | Plaza Huincul → Chubut | 940 | 0.48 | 203 mm | 1986 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.