LNG Chain

Import terminal · Uusimaa, Finland

Southern Finland LNG Terminal

Southern Finland LNG Terminal is a cancelled LNG import terminal in Uusimaa, Finland. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Gasum Oyj.

Operating

no units operating

Under construction

no units under construction

Proposed

no units proposed

At a glance

Country
Finland
State / province
Uusimaa
Region
Not reported
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Cancelled
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
60.0137° N, 23.9571° E
GEM terminal ID
T100000130442
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedCancelledNot reportedNot reportedNot reportedGasum Oyj [100%]

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Owners

Location

Southern Finland LNG Terminal at 60.0137° N, 23.9571° E, with 17 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
60.0137° N, 23.9571° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Balticconnector Gas PipelineOperating155 km2.6 bcm/y0.9 kmroute proximity
Inkoo–Mantsala Gas PipelineOperating108 km4.3 kmroute proximity
Helsinki–Siuntio Gas PipelineOperating41 km20.4 kmroute proximity
Salam-Abu Gharadig Southern Gas PipelineOperating212 km1.91 bcm/yname match
Southern Algeria Gas Transmission NetworkOperating530 km7.15 bcm/yname match
Southern Algeria Gas Transmission NetworkOperating379 kmname match
Southern Algeria Gas Transmission NetworkUnder construction242 kmname match
Southern Algeria Gas Transmission NetworkUnder construction109 kmname match
Southern Algeria Gas Transmission NetworkOperating229 kmname match
Southern Cross Gas PipelineOperating400 km1.83 bcm/yname match
Southern Cross Gas PipelineProposed920 kmname match
Southern Natural Gas PipelineOperating12,231 km39.86 bcm/yname match
Southern Natural Gas PipelineProposed468 km13.29 bcm/yname match
Southern Peru Gas PipelineProposed1,100 km15.33 bcm/yname match
Southern Reliability Link PipelineOperating48 km2.86 bcm/yname match
Southern Star Central Gas PipelineOperating9,334 km24.53 bcm/yname match
Southern Trails Gas PipelineOperating652 km0.89 bcm/yname match

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

  • Strait of Gibraltar
  • Suez Canal
  • Bab el-Mandeb
  • Danish Straits

Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.