Gas transmission pipeline · Ilizi to Djanet
Southern Algeria Gas Transmission Network
Southern Algeria Gas Transmission Network is an operating gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 379 km long, starting up in 2018. It runs from Ilizi to Djanet. It is owned by Société Algérienne de Gestion du Réseau de Transport du Gaz (GRTG).
Length
379 km
Capacity
Not reported
Segments tracked
1
Largest diameter 254 mm (10 in)
Route
Southern Algeria Gas Transmission Network runs from Ilizi to Djanet. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ilizi
- To
- Djanet
- Start country
- Algeria
- End country
- Algeria
- Countries crossed
- Algeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 387 km
- GEM pipeline ID
- P2059
- Start year
- 2018
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Ilizi-Djanet Gas Pipeline | Operating | Ilizi → Djanet | 379 | Not reported | 254 mm | 2018 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Southern Finland LNG Terminal | Finland | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.