Import terminal · Germany
Jade Energy LNG Terminal
Jade Energy LNG Terminal is a proposed LNG import terminal in Germany. The tracker lists 3 tracked units with 14.7 Mtpa proposed. It is owned by Deutsche Grüngas und Energieversorgung GmbH.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
14.7 Mtpa
20 bcm/y · 3 units
At a glance
- Country
- Germany
- State / province
- Not reported
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Proposed
- Trains / phases tracked
- 3
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 53.5167° N, 8.1333° E
- GEM terminal ID
- T100000131001
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Proposed | 11 | 15 | — | — | Not reported | Deutsche Grüngas und Energieversorgung GmbH |
| Unit Expansion | Proposed | 3.68 | 5 | — | — | Not reported | Deutsche Grüngas und Energieversorgung GmbH |
| Unit eLNG Import Terminal | Proposed | Not reported | Not reported | — | — | Not reported | Deutsche Grüngas und Energieversorgung GmbH |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 3 | 14.7 | 20 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Jade Energy LNG Terminal at 53.5167° N, 8.1333° E, with 10 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 53.5167° N, 8.1333° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Wilhelmshaven LNG Terminal Pipeline | Operating | 28 km | 10 bcm/y | 4.5 km | route proximity |
| NETRA Gas Pipeline | Operating | 408 km | 21.4 bcm/y | 11.3 km | route proximity |
| Etzel-Wardenburg-Drohne Gas Pipeline | Under construction | 60 km | — | 12.2 km | route proximity |
| Bunde-Etzel Gas Pipeline | Operating | 60 km | 39.4 bcm/y | 13.2 km | route proximity |
| Blue Energy Bowen Gas Pipeline | Proposed | 500 km | 3.01 bcm/y | — | name match |
| Kinetica Energy Express | Operating | 1,139 km | — | — | name match |
| Louisiana Energy Access Project Pipeline | Operating | 241 km | 10.22 bcm/y | — | name match |
| Louisiana Energy Gateway | Under construction | 209 km | 18.4 bcm/y | — | name match |
| Victoria Energy Terminal Gas Pipeline | Proposed | 19 km | — | — | name match |
| Western Energy Storage and Transportation Header Project | Cancelled | 1,046 km | 20.44 bcm/y | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.