Import terminal · Provence-Alpes-Côte d'Azur, France
Fos Tonkin LNG Terminal
Fos Tonkin LNG Terminal is an operating LNG import terminal in Provence-Alpes-Côte d'Azur, France. The tracker lists 2 tracked units with 1.1 Mtpa operating, 0.2 Mtpa proposed, the earliest starting in 1972. It is owned by Elengy.
Operating
1.1 Mtpa
1.5 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
0.2 Mtpa
0.27 bcm/y · 1 unit
At a glance
- Country
- France
- State / province
- Provence-Alpes-Côte d'Azur
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Operating
- Trains / phases tracked
- 2
- Earliest start year
- 1972
- Latest start year
- 1972
- Coordinates
- 43.4540° N, 4.8517° E
- GEM terminal ID
- T100000130452
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 1.1 | 1.5 | 1972 | — | Not reported | Elengy SA [100%] |
| Unit Ammonia Import Terminal | Proposed | 0.2 | 0.27 | — | — | Not reported | Elengy SA [100%] |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Fos Tonkin LNG Terminal at 43.4540° N, 4.8517° E, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 43.4540° N, 4.8517° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| NaTran Gas Pipeline Network | Operating | 29,574 km | — | 0.1 km | route proximity |
| H2Med Pipeline | Proposed | 450 km | 2.72 bcm/y | 1.2 km | route proximity |
| Midi-Catalonia Pipeline | Cancelled | 1,250 km | 7.5 bcm/y | 15.1 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.