Export terminal · Queensland, Australia
Arrow Energy LNG Terminal
Arrow Energy LNG Terminal is a cancelled LNG export terminal in Queensland, Australia. The tracker lists 1 tracked unit; capacity is not reported. It is owned by CNPC and Shell.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- Australia
- State / province
- Queensland
- Region
- Not reported
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 23.7825° S, 151.2295° E
- GEM terminal ID
- T100000130326
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit T1-T4 | Cancelled | 18 | 24.5 | — | — | Not reported | PetroChina Co Ltd [50%]; Shell PLC [50%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 18 | 24.5 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Arrow Energy LNG Terminal at 23.7825° S, 151.2295° E, with 13 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 23.7825° S, 151.2295° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Papua New Guinea to Queensland Gas Pipeline | Cancelled | 3,800 km | 6.13 bcm/y | 2.5 km | route proximity |
| APLNG Pipeline | Operating | 530 km | 15.11 bcm/y | 5 km | route proximity |
| Queensland Gas Pipeline | Operating | 629 km | 1.5 bcm/y | 7.1 km | route proximity |
| Wallumbilla–Gladstone Pipeline | Operating | 540 km | — | 7.1 km | route proximity |
| Wide Bay Pipeline | Operating | 274 km | 0.06 bcm/y | 8.7 km | route proximity |
| GLNG Pipeline | Operating | 435 km | 13.85 bcm/y | 12.2 km | route proximity |
| Arrow Bowen Pipeline | Cancelled | 580 km | 15.05 bcm/y | 17.2 km | route proximity |
| Blue Energy Bowen Gas Pipeline | Proposed | 500 km | 3.01 bcm/y | — | name match |
| Kinetica Energy Express | Operating | 1,139 km | — | — | name match |
| Louisiana Energy Access Project Pipeline | Operating | 241 km | 10.22 bcm/y | — | name match |
| Louisiana Energy Gateway | Under construction | 209 km | 18.4 bcm/y | — | name match |
| Victoria Energy Terminal Gas Pipeline | Proposed | 19 km | — | — | name match |
| Western Energy Storage and Transportation Header Project | Cancelled | 1,046 km | 20.44 bcm/y | — | name match |