Gas transmission pipeline · Uganda – Tanzania
Uganda Tanzania Pipeline
Uganda Tanzania Pipeline is a shelved gas transmission pipeline crossing Uganda, Tanzania. The tracker lists 1 tracked segment, 1,275 km long, starting up in 2021. It is owned by Tanzania Petroleum Development Corp.
Length
1,275 km
Capacity
Not reported
Segments tracked
1
Route
Uganda Tanzania Pipeline runs from Uganda – Tanzania. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Dar es Salam
- To
- Not reported
- Start country
- Uganda
- End country
- Tanzania
- Countries crossed
- Uganda, Tanzania
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 1,276 km
- GEM pipeline ID
- P1312
- Start year
- 2021
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Shelved | Dar es Salam → ? | 1,275 | Not reported | — | 2021 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Tanzania LNG Terminal | Tanzania | Export | Proposed | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.