LNG Chain

Gas transmission pipeline · Nikiski to Beluga

Tyonek Gas Pipeline

Tyonek Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 82 km long, starting up in 1968. It runs from Nikiski to Beluga. It is owned by Harvest Alaska LLC.

Length

82 km

Capacity

Not reported

Segments tracked

1

Largest diameter 254 mm (10 in)

Route

Tyonek Gas Pipeline runs from Nikiski to Beluga. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Nikiski
To
Beluga
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
80 km
GEM pipeline ID
P7461
Start year
1968
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNikiski → Beluga82Not reported254 mm1968GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Kenai LNG TerminalUnited StatesImportProposed0.6 kmroute proximity
Alaska LNG TerminalUnited StatesExportProposed2.9 kmroute proximity
Cook Inlet FSRUUnited StatesImportProposed15.8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.