Gas transmission pipeline · Gresik to Duri
Trans-Central Sumatra Gas Pipeline
Trans-Central Sumatra Gas Pipeline is an operating gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 536 km long and 4.36 bcm/y of capacity, starting up in 1998. It runs from Gresik to Duri. It is owned by Transgasindo TGI.
Length
536 km
Capacity
4.36 bcm/y
3.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 711 mm (28 in)
Route
Trans-Central Sumatra Gas Pipeline runs from Gresik to Duri. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Gresik
- To
- Duri
- Start country
- Indonesia
- End country
- Indonesia
- Countries crossed
- Indonesia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 499 km
- GEM pipeline ID
- P0988
- Start year
- 1998
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Gresik → Duri | 536 | 4.36 | 711 mm | 1998 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Central Java FSRU | Indonesia | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Transgasindo TGI100%