LNG Chain

Gas transmission pipeline · Cagliari to Olbia

Methanization of Sardinia Project

Methanization of Sardinia Project is a proposed gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 420 km long and 1.68 bcm/y of capacity, starting up in 2027. It runs from Cagliari to Olbia. It is owned by ENURA SpA.

Length

420 km

Capacity

1.68 bcm/y

1.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 254 mm (10 in)

Route

Methanization of Sardinia Project runs from Cagliari to Olbia. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Cagliari
To
Olbia
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
560 km
GEM pipeline ID
P2235
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase 1ProposedCagliari → Olbia4201.68254 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Oristano FSRUItalyImportProposed1.1 kmroute proximity
HIGAS LNG TerminalItalyImportOperating1.2 kmroute proximity
Portovesme FSRUItalyImportCancelled6 kmroute proximity
Porto Torres FSRUItalyImportProposed7.2 kmroute proximity
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies