Export terminal · Canada
Summit Lake PG LNG Terminal
Summit Lake PG LNG Terminal is a proposed LNG export terminal in Canada. The tracker lists 2 tracked units with 2.7 Mtpa proposed. It is owned by JX LNG Canada Ltd.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
2.7 Mtpa
3.67 bcm/y · 2 units
At a glance
- Country
- Canada
- State / province
- Not reported
- Region
- Not reported
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Proposed
- Trains / phases tracked
- 2
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 54.1829° N, 122.6282° W
- GEM terminal ID
- T100001083566
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1 | Proposed | 1.35 | 1.84 | — | — | Not reported | JX LNG Canada Ltd [100%] |
| Unit Phase 2 | Proposed | 1.35 | 1.84 | — | — | Not reported | JX LNG Canada Ltd [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 2 | 2.7 | 3.67 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Operators
Location
Summit Lake PG LNG Terminal at 54.1829° N, 122.6282° W, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 54.1829° N, 122.6282° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| BC Gas Pipeline | Operating | 2,953 km | 34.75 bcm/y | 0.2 km | route proximity |
| BC Gas Pipeline | Operating | 39 km | 2.45 bcm/y | 0.2 km | route proximity |
| Merrick Mainline Pipeline | Cancelled | 260 km | 20.44 bcm/y | 11.5 km | route proximity |