Import terminal · Binh Thuan, Vietnam
Son My LNG Terminal
Son My LNG Terminal is an under construction LNG import terminal in Binh Thuan, Vietnam. The tracker lists 2 tracked units with 2.4 Mtpa under construction, 2.4 Mtpa proposed. It is owned by PetroVietnam Gas JSC and AES Corp.
Operating
—
no units operating
Under construction
2.4 Mtpa
3.26 bcm/y · 1 unit
Proposed
2.4 Mtpa
3.26 bcm/y · 1 unit
At a glance
- Country
- Vietnam
- State / province
- Binh Thuan
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Under construction
- Trains / phases tracked
- 2
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 10.6501° N, 107.6846° E
- GEM terminal ID
- T100000130325
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1 | Proposed | 2.4 | 3.26 | — | — | Not reported | PetroVietnam Gas JSC [61%]; AES Corp [39%] |
| Unit Phase 2 | Under construction | 2.4 | 3.26 | — | — | Not reported | PetroVietnam Gas JSC [61%]; AES Corp [39%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Under construction | 1 | 2.4 | 3.26 |
| Proposed | 1 | 2.4 | 3.26 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Location
Son My LNG Terminal at 10.6501° N, 107.6846° E, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 10.6501° N, 107.6846° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Son My LNG Terminal to Son My Electricity Center Gas Pipeline | Proposed | 10 km | 11 bcm/y | 0 km | route proximity |
| Son My–Phu My Gas Pipeline | Proposed | 85 km | 9 bcm/y | 0 km | route proximity |
| Son My–Su Tu Trang Gas Pipeline | Proposed | 100 km | 4 bcm/y | 0 km | route proximity |