LNG Chain

Export terminal · Sonora, Mexico

Saguaro Energía LNG Terminal

Saguaro Energía LNG Terminal is a proposed LNG export terminal in Sonora, Mexico. The tracker lists 2 tracked units with 30 Mtpa proposed. It is owned by Mexico Pacific Holdings LLC.

Operating

no units operating

Under construction

no units under construction

Proposed

30 Mtpa

40.8 bcm/y · 2 units

At a glance

Country
Mexico
State / province
Sonora
Region
Not reported
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Proposed
Trains / phases tracked
2
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
29.9058° N, 112.6880° W
GEM terminal ID
T100000130809
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Unit Phase 1 (Trains 1-3)Proposed1520.4Not reportedMexico Pacific Holdings LLC [100%]
Unit Phase 2 (Trains 4-6)Proposed1520.4Not reportedMexico Pacific Holdings LLC [100%]

Capacity by status

StatusUnitsMtpabcm/y
Proposed23040.8

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Saguaro Energía LNG Terminal at 29.9058° N, 112.6880° W, with 6 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
29.9058° N, 112.6880° W
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Sierra Madre Gas PipelineProposed800 km28.62 bcm/y0.1 kmroute proximity
Sásabe-Guaymas Gas PipelineOperating505 km7.87 bcm/y0.3 kmroute proximity
Energia Mayakan PipelineOperating775 km2.56 bcm/yname match
Energia Mayakan PipelineShelved159 km1.02 bcm/yname match
Energia Mayakan PipelineUnder construction700 km3.24 bcm/yname match
Saguaro Connector PipelineProposed249 km28.62 bcm/yname match