LNG Chain

Export terminal · Bushehr Province, Iran

Persian NIOC LNG Terminal

Persian NIOC LNG Terminal is a cancelled LNG export terminal in Bushehr Province, Iran. The tracker lists 1 tracked unit; capacity is not reported. Owners include National Iranian Gas Export Co, Repsol SA, Shell and others.

Operating

no units operating

Under construction

no units under construction

Proposed

no units proposed

At a glance

Country
Iran
State / province
Bushehr Province
Region
Not reported
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Cancelled
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
27.4761° N, 52.6075° E
GEM terminal ID
T100000130586
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Unit T1-T2Cancelled810.9Not reportedNational Iranian Gas Export Co [50%]; Repsol SA [25%]; Shell PLC [25%]

Capacity by status

StatusUnitsMtpabcm/y
Cancelled1810.9

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Persian NIOC LNG Terminal at 27.4761° N, 52.6075° E, with 15 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
27.4761° N, 52.6075° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Iran–Iraq–Syria Gas PipelineCancelled5,600 km40.15 bcm/y0.2 kmroute proximity
Iran-Pakistan-India PipelineCancelled2,700 km39.7 bcm/y0.3 kmroute proximity
Iran-Pakistan PipelineUnder construction2,775 km7.67 bcm/y0.4 kmroute proximity
Off-Shore Gas PipelineProposed1,500 km10.22 bcm/y1.4 kmroute proximity
Persian Gas PipelineCancelled3,300 km40 bcm/y1.6 kmroute proximity
Siri–Asaluyeh Gas PipelineOperating305 km5.42 bcm/y1.6 kmroute proximity
IGAT 7 Gas PipelineOperating907 km40.15 bcm/y3.9 kmroute proximity
IGAT 4 Gas PipelineOperating1,145 km40.15 bcm/y4 kmroute proximity
IGAT 5 Gas PipelineOperating540 km34.68 bcm/y4 kmroute proximity
IGAT 8 Gas PipelineOperating1,050 km39.7 bcm/y4 kmroute proximity
IGAT 10 Gas PipelineOperating632 km25.55 bcm/y4.1 kmroute proximity
IGAT 2 Gas PipelineOperating1,039 km32.85 bcm/y4.1 kmroute proximity
IGAT 3 Gas PipelineOperating1,267 km32.85 bcm/y4.1 kmroute proximity
IGAT 6 Gas PipelineOperating1,082 km39.7 bcm/y4.1 kmroute proximity
IGAT 9 Gas PipelineUnder construction1,863 km39.7 bcm/y4.1 kmroute proximity