LNG Chain

Export terminal · Damiette, Egypt

Damietta SEGAS LNG Terminal

Damietta SEGAS LNG Terminal is an operating LNG export terminal in Damiette, Egypt. The tracker lists 2 tracked units with 5 Mtpa operating, the earliest starting in 2005. It is owned by Spanish Egyptian Gas Company SAE.

Operating

5 Mtpa

6.8 bcm/y · 1 unit

Under construction

no units under construction

Proposed

no units proposed

At a glance

Country
Egypt
State / province
Damiette
Region
Not reported
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Operating
Trains / phases tracked
2
Earliest start year
2005
Latest start year
2005
Coordinates
31.4690° N, 31.7473° E
GEM terminal ID
T100000130249
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Unit T1Operating56.82005Not reportedSpanish Egyptian Gas Company SAE [100%]
Unit T2Shelved56.8Not reportedSpanish Egyptian Gas Company SAE [100%]

Capacity by status

StatusUnitsMtpabcm/y
Operating156.8
Shelved156.8

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Damietta SEGAS LNG Terminal at 31.4690° N, 31.7473° E, with 8 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
31.4690° N, 31.7473° E
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Cyprus–Egypt Gas PipelineProposed280 km0.08 bcm/y0 kmroute proximity
Damietta-Idku Gas PipelineOperating165 km0 kmroute proximity
Damietta–SEGAS PipelineOperating12 km0 kmroute proximity
Al Gamil–Damietta Gas PipelineOperating50 km7.67 bcm/y0.4 kmroute proximity
Port Said-Arish Gas PipelineOperating235 km6.1 kmroute proximity
Nooros–Abu Madi–El Gamil Gas PiplineOperating92 km7.15 bcm/y12.4 kmroute proximity
Gamasa–Veunsa Gas PipelineOperating34 km0.07 bcm/y13.7 kmroute proximity
Gamasa-Edku Gas PipelineProposed121 km21.4 kmroute proximity

Exposed to chokepoints

Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.

DestinationChokepoints on the usual routeAlternative route
EuropeStrait of Gibraltar

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.