Liquefaction process and equipment
ConocoPhillips
Licenses the Optimized Cascade process, which uses three cascaded pure-refrigerant circuits with brazed aluminium heat exchangers, and has been licensed for 28 LNG trains.
ConocoPhillips is linked to 5 terminals, 13 pipelines in the tracker.
Terminals in the tracker
5
as owner, operator or parent
Pipelines
13
Carriers
0
Profile
- Headquarters
- United States
- Listed as
- Not reported
- Segments
- Liquefaction process and equipment
- In the tracker as
- ConocoPhillips
Assets in the tracker
Where this firm appears in Global Energy Monitor's data as an owner, operator, parent or builder.
Terminals
- Beacon Port LNG TerminalUnited States
- Compass Port LNG TerminalUnited States
- Long Beach LNG TerminalUnited States
- Poseidon FLNG TerminalAustralia
- Tjelbergodden LNG TerminalNorway
Pipelines
- APLNG Pipeline530 km
- Bayu-Undan to Darwin Pipeline502 km
- Denali Alaskan Natural Gas Pipeline1,126 km
- Fargh–Sarir Gas Pipeline97 km
- Farigh-Intisar 103A Gas Pipeline110 km
- Haltenpipe Gas Pipeline250 km
- Intisar–Sarir Gas Pipeline185 km
- Ironbark Project Pipeline34 km
- Mackenzie Gas Pipeline Project1,220 km
- Polarled Gas Pipeline482 km
- Statpipe Gas Pipeline892 km
- Vesterled Gas Pipeline360 km
Sources
Every claim on this page rests on these public pages. If one breaks or contradicts the text, the entry is corrected or removed.
- https://lnglicensing.conocophillips.com/what-we-do/lng-technology/optimized-cascade-process/
- https://lnglicensing.conocophillips.com/who-we-are/our-expertise/
This page is editorial: it is written and checked by hand, not derived from the Global Energy Monitor tracker. Asset counts beside it come from the tracker and are computed at build time.