LNG Chain

Gas transmission pipeline · Zawtika to Kanbauk

Zawtika Gas Pipeline

Zawtika Gas Pipeline is an operating gas transmission pipeline in Myanmar. The tracker lists 1 tracked segment, 300 km long and 3.53 bcm/y of capacity, starting up in 2014. It runs from Zawtika to Kanbauk. It is owned by PTT Exploration and Production and Myanma Oil and Gas Enterprise.

Length

300 km

Capacity

3.53 bcm/y

2.6 Mtpa LNG equivalent

Segments tracked

1

Route

Zawtika Gas Pipeline runs from Zawtika to Kanbauk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Zawtika
To
Kanbauk
Start country
Myanmar
End country
Myanmar
Countries crossed
Myanmar
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
177 km
GEM pipeline ID
P2252
Start year
2014
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingZawtika → Kanbauk3003.532014GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Kanbauk FSRUMyanmarImportCancelled15.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.