Yunnan Gas Pipeline Network

Yunnan Gas Pipeline Network is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 106 km long and 0.09 bcm/y of capacity, starting up in 2018. It runs from No. 24 valve chamber of Sino-Myanmar Gas Pipeline, Chijiu Township, Fumin County to Changshui Airport Terminal Station, Bajia Village, Central Yunnan Industrial New Area. It is owned by Yunnan Natural Gas Co Ltd.

Length

106 km

Capacity

0.09 bcm/y

0.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 350 mm (14 in)

Route

Yunnan Gas Pipeline Network runs from No. 24 valve chamber of Sino-Myanmar Gas Pipeline, Chijiu Township, Fumin County to Changshui Airport Terminal Station, Bajia Village, Central Yunnan Industrial New Area. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
No. 24 valve chamber of Sino-Myanmar Gas Pipeline, Chijiu Township, Fumin County
To
Changshui Airport Terminal Station, Bajia Village, Central Yunnan Industrial New Area
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
54 km
GEM pipeline ID
P4502
Start year
2018
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Fumin–Changshui BranchOperatingNo. 24 valve chamber of Sino-Myanmar Gas Pipeline, Chijiu Township, Fumin County → Changshui Airport Terminal Station, Bajia Village, Central Yunnan Industrial New Area1060.09350 mm2018GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.