LNG Chain

Gas transmission pipeline · Ligurian Sea to Cairo Montenotte

Upper Tyrrhenian Sea Gas Pipeline

Upper Tyrrhenian Sea Gas Pipeline is a proposed gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 35 km long, starting up in 2026. It runs from Ligurian Sea to Cairo Montenotte.

Length

35 km

Capacity

Not reported

Segments tracked

1

Largest diameter 500 mm (20 in)

Route

Upper Tyrrhenian Sea Gas Pipeline runs from Ligurian Sea to Cairo Montenotte. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ligurian Sea
To
Cairo Montenotte
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
37 km
GEM pipeline ID
P7703
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedLigurian Sea → Cairo Montenotte35Not reported500 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.