LNG Chain

Gas transmission pipeline · Umag to Koper

Umag-Plovanija-Koper Gas Pipeline

Umag-Plovanija-Koper Gas Pipeline is a cancelled gas transmission pipeline crossing Croatia, Slovenia. The tracker lists 1 tracked segment, 8 km long and 0.58 bcm/y of capacity, starting up in 2029. It runs from Umag to Koper. It is owned by Plinacro Ltd.

Length

8 km

Capacity

0.58 bcm/y

0.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 300 mm (12 in)

Route

Umag-Plovanija-Koper Gas Pipeline runs from Umag to Koper. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Umag
To
Koper
Start country
Croatia
End country
Slovenia
Countries crossed
Croatia, Slovenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
22 km
GEM pipeline ID
P1712
Start year
2029
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledUmag → Koper80.58300 mm2029GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Zaule LNG TerminalItalyImportCancelled8.7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies