LNG Chain

Gas transmission pipeline · Uthmaniyah Gas Plant to Berri Gas Plant

UBTG-1-Berri Gas Pipeline

UBTG-1-Berri Gas Pipeline is an operating gas transmission pipeline in Saudi Arabia. The tracker lists 1 tracked segment, 249 km long. It runs from Uthmaniyah Gas Plant to Berri Gas Plant. It is owned by Saudi Aramco.

Length

249 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1422 mm (56 in)

Route

UBTG-1-Berri Gas Pipeline runs from Uthmaniyah Gas Plant to Berri Gas Plant. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Uthmaniyah Gas Plant
To
Berri Gas Plant
Start country
Saudi Arabia
End country
Saudi Arabia
Countries crossed
Saudi Arabia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
248 km
GEM pipeline ID
P1898
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingUthmaniyah Gas Plant → Berri Gas Plant249Not reported1422 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies